BRP Evinrude Specifications Page 55

  • Download
  • Add to my manuals
  • Print
  • Page
    / 102
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 54
53
OUTBOARD RIGGING
EVINRUDE E-TEC 90° V MODELS 200–300 HP
3
same path to the starboard side of the powerhead.
Secure all cables with clamps.
After installation, make sure there
is enough clearance for all cables to avoid
binding or chafing through all engine steering
and tilting angles.
Control Cable Installation
Refer to Control Cable Identification on p. 51.
Remove control cable trunnion covers and cable
attachment hardware.
Shift Cable Installation and Adjustment
Place the shift cable on the shift lever pin and
install the washer and retainer clip. Refer to Cable
Retainer Clip Installation on p. 51.
IMPORTANT: Do not bend or deform clip.
Make sure the remote control, gearcase, shift link-
age, and shift cable are in NEUTRAL.
Hold the shift linkage in NEUTRAL.
Push and pull on the shift cable and observe the
cable slack. Hold the casing guide in the center of
the slack.
Adjust shift cable trunnion to align with center of
the trunnion block. Place cable trunnion in trun-
nion block.
Install trunnion cover and screw. Tighten screw to
a torque of 60 to 80 in. lbs. (7 to 9 N·m).
Throttle Cable Installation and Adjustment
With remote control lever in NEUTRAL, pull firmly
on throttle cable casing to remove slack.
Place throttle cable on throttle lever pin and install
washer and retainer clip. Refer to Cable Retainer
Clip Installation on p. 51.
003974
1. Trunnion covers 005037
NOTICE
1. Shift cable retainer clip and washer
2. Shift cable trunnion
005038
1. Throttle cable retainer clip and washer 003967
Page view 54
1 2 ... 50 51 52 53 54 55 56 57 58 59 60 ... 101 102

Comments to this Manuals

No comments